Tosoh Quartz - County Durham

Tosoh Quartz

IUS delivered this work under our as an accredited Independent Connections Provider (ICP). 

Client

Tosoh Quartz

Project

Increased HV Supply Capacity to Factory

Location

Greencroft, County Durham

SERVICES PROVIDED
  • HV and LV design
  • ICP 20kV connection comprising:
  • GRP substation accommodation
  • 20kV metered ring main unit
  • 500kV transformer with close coupled
    LV board HV and LV cabling
  • Customer replacement LV switchboard
  • Construction to the adoptable
    standards of NPg
OVERVIEW

IUS delivered this work under our as an accredited Independent Connections Provider (ICP). Therefore, the works were carried out to the adoptable standards of the Distribution Network Operator, Northern Powergrid (NPg). The scope included the design, procurement, and installation of a 20kV distribution substation, low voltage sub-mains cabling, and a replacement customer low voltage switchboard to provide an increased supply capacity to the Tosoh Quartz factory in Greencroft, County Durham. The facility produces quartz glassware for the semiconductor industry for use in the processing of integrated circuits.

DESCRIPTION

IUS project managed the installation of the substation building to specification. The 115- meter feeder route encompassed 2 x 185mm aluminium 20kV XLPE Triplex cables to the point of connection onto the NPg network. Cable trenches were excavated on both private land and the public highway. IUS HV electrical fitters completed the installation of a 20kV
ABB safe plus ring main unit, 500kVA transformer with close coupled LV cabinet, earthing, protection, and metering cabling. IUS HV Jointers carried out the HV cable terminations. An IUS protection engineer conducted the pre-commissioning and witness testing for NPg. The IUS Senior Authorised Person provided the necessary safety documentation and oversight of the works. Customer LV sub mains cables were installed from the substation into the factory on high-level containment to supply a new low-voltage switchboard. Existing factory supplies were reconnected to the new switchboard during a planned outage giving the customer scope for their future expansion plans.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

blackburn meadows high voltage connections
Case Study: Blackburn Meadows WwTW upgrade for Yorkshire Water
This case study showcases Blackburn Meadows WwTW upgrade, and we are proud that Integrated Utility Services played a key role in helping deliver this major step forward for Yorkshire Water.
IUS Colleagues volunteer at Teesside Foodbank
Colleagues Volunteer at Teesside Foodbank
On 27th November, two of our colleagues, Kayleigh Forster and Daisy Ezard, volunteered at Tesco Billingham giving back to the community, supporting the Billingham & Stockton Borough Foodbank with the Trussell Trust. 
Road Safety Week 2025 at IUS
IUS Supports Road Safety Week 2025
Integrated Utility Services is proud to support our group-wide commitment to Road Safety Week, reminding everyone that safe vehicles save lives.