Renewable Energy

Generally, the Developer will construct the renewable energy assets, whether it be a solar farm or a wind turbine.

IUS are ideally paced to provide the private wire substations and cable works as well as the contestable connection to the grid network.

IUS support the UK sustainable energy agenda and have a particular strength in Wind, Solar and Battery Storage projects.

IUS has extensive experience in the installation of renewable energy systems, including operating as an Independent Connections Provider, offering a full turnkey solution.

Decarbonisation is at the forefront of Government policy and IUS are here to assist you with the goals and targets of your business. IUS have been involved in contestable connections and private infrastructure to harness power from wind, solar, wave, anaerobic and heat exchange systems.

We can assist clients in gaining the maximum benefit from their infrastructure to contribute to the Global Challenge.

 

As the demand for renewable energy has grown, so too has the number of projects IUS has delivered.

This is linked to the full turnkey services IUS provide, which the site Developer benefits from. Our aim is to provide cost saving solutions without any reduction in quality. The portfolio of projects completed is testimony to our success.

Lochend Windfarm 33kV Substation

Lochend Windfarm

IUS completed the installation of two 33kV cable circuits, which form part of the Lochend windfarm connection ...

Client

Lochend Windfarm

Project

33kV Substation Installation

Location

Caithness, Scotland

SERVICES PROVIDED
  • 33kV Contestable connection work
  • On-site private 33kV infrastructure work
  • Procurement of equipment
  • Supply and installation of substation GRP to DNO standards
  • Installation of 33kV switchgear
  • Heavy lifting operations
  • Protection design
  • Interfacing with DNO network and generation control systems
  • Testing and commissioning
  • Preparation of hand back documentation
  • Principal contractor for the connection works
OVERVIEW

IUS completed the electrical construction works associated with the Lochend Wind Farm development. The connection of four 2.3MW Wind Turbines to the grid required a 33kV extension to the Scottish and Southern Energy electrical network. IUS was appointed to undertake the design and installation of the 33kV contestable elements of the connection activity.

DESCRIPTION

The project involved the supply and installation of a specialised multi-part GRP enclosure, which reduced construction costs and on-site installation times. Within the GRP housing, 33kV Schneider Electric WS switchgear was installed with connections made to the extra high voltage cable circuits using Pfisterer terminations. The design, installation, and commissioning of all associated DC and control systems also formed part of the IUS work scope.

DOWNLOAD PDF VERSION

EnergieKontor Operation & Maintenance of Customer Owned HV & EHV Networks

EnergieKontor

IUS has c.1100 operation and maintenance agreements throughout the UK. There are three locations ...

Client

EnergieKontor

Project

Operation and maintenance of power systems at three UK windfarm sites

Location

Burton Pidsea, East Yorkshire Withernwick, East Yorkshire Lilbourne, Northamptonshire

SERVICES PROVIDED
  • Operation and maintenance of customer HV and EHV networks
  • Liaison with site operators
  • Liaison with local Distribution Network Operators
  • Site inspection
  • Planned maintenance
  • Reactive response to site
  • Fault identification and repair
OVERVIEW

IUS has c.1100 operation and maintenance agreements throughout the UK. There are three locations where IUS carry out this activity for EnergieKontor on their UK windfarms. This service includes inspection and switchgear maintenance. IUS also provides a call out service for emergency response.

DESCRIPTION

IUS is contracted to provide planned and reactive operation and maintenance services at three UK windfarms operated by EnergieKontour.

The contracted sites are:

  • Burton Pidsea Windfarm in East Yorkshire, which comprises of three turbines with a capacity of 10.2 MW.
  • Withernwick Windfarm in East Yorkshire, which comprises of nine turbines with a capacity 18.45 MW.
  • Lilbourne Windfarm in Northamptonshire, which comprises of five turbines with a capacity of 10 MW.

Site operations and activities are coordinated with the EnergieKontour control facility in Germany.

IUS services on these and similar contracts comprise of network operation, site inspection, planned maintenance and fault management and repair.

DOWNLOAD PDF VERSION

Lochend Windfarm 33kV Contestable Cable Circuit Installation

Lochend Windfarm

IUS completed the installation of two 33kV cable circuits, which form part of the ...

Client

Lochend Windfarm

Project

33kV Cable Ploughing

Location

Caithness, Scotland

SERVICES PROVIDED
  • Ploughing of two 33kV cable circuits
  • Installation of fiber optic cable for entire route
  • 33kV cable jointing and testing
  • Duct installations for road crossings
  • Procurement of equipment
  • Provision of specialised vehicles for site access
  • Provision of full GPS tagged as laid records
OVERVIEW

IUS completed the installation of two 33kV cable circuits, which form part of the Lochend windfarm connection works. This was a challenging route and IUS implemented cable ploughing technology.

DESCRIPTION

The contestable connection design required the installation of 18km of 33kV cabling across two feeders between the existing Distribution NetworkOperator (DNO) point of connection and the new windfarm. The route was across soft peat and through mature forestry. Due to environmental restrictions the works were completed in December and January, which presented additional challenges.

The use of cable ploughing techniques and low ground pressure bearing equipment significantly reduced the installation timescales and disruption to the ground conditions. A Hagglund ATV was deployed to ensure safeaccess and egress to the sites at all times.

DOWNLOAD PDF VERSION

Melton Wind Farm 33kV Contestable Connection & Private Infrastructure Works

Melton Windfarm

IUS have completed the electrical construction works associated with the Melton Wind Farm ...

Client

Melton Wind Ltd / Seneca Global Energy

Project

Melton Wind Farm

Location

Gibson Lane, Melton, Hull, East Yorkshire

SERVICES PROVIDED
  • Outline and detailed design(Electrical and civil)
  • 33kV Contestable connection work
  • On site private 33kV infrastructure work
  • Procurement of equipment
  • Construction of primary substation building to DNO standards
  • HDD railway crossing
  • Possession planning
  • Installation of 33kV switchgear
  • Installation of containerised substations on raised platforms
OVERVIEW

IUS have completed the electrical construction works associated with the Melton Wind Farm development. The connection of the two 2.3MW Wind Turbines to the grid required a 33kV extension to the Northern Powergrid (NPg) electrical network. IUS were appointed to undertake the design and installation of the 33kV contestable elements of the connection works, along with the private 33kV and LV infrastructure.

DESCRIPTION

The project involved the construction of a combined building to house the 33kV NPg intake substation equipment and the customer owned 33kV switchgear.

The 33kV cable route to the new substation required the crossing of the Hull–London Railway Line by Horizontal Directional Drilling (HDD) methods. The IUS scope of works included all negotiations with Network Rail, HDD design and settlement calculations, possession planning and drilling operations.

The private electrical infrastructure installed by IUS included; 33kV, pilot and LV single core cables; a three panel 33kV switchboard; protection equipment; substation ancillary apparatus and two 2.5MVA containerised substations on raised platforms (flood risk mitigation).

DOWNLOAD PDF VERSION

Tesla Energy Projects

Tesla Energy Projects

Harmony Energy is at the forefront of a greener and more sustainable future. Harmony Energy selected Tesla Energy Projects as their main contractor, who in turn procured the services of IUS for the electrical installation works. The Little Raith Battery Energy Storage System can store enough energy to power c. 450,000 homes for two hours in the aggregate.

Client

Tesla

Project

49.5MW/99MWh Battery Energy Storage System

Location

Little Raith, Fife, Scotland

SERVICES PROVIDED
  • Design and Engineering
    - Detailed Civil Design Works of structural bases for all site-based equipment,
    - Detailed Electrical Contestable Design Works, including:
    - Earthing System Design
    - SLD
    - Cable Layout and Schedules
    - SCADA Schedule
    - Camera & Lighting Design
    - Detailed SCADA and Control System Engineering
  • Civil Works for all structural bases, perimeter fencing, landscaping, and site restoration
  • Logistics – Offload, installation, and anchoring of all plant and equipment, including:
    - 27 Tesla Megapacks
    - 15 Wilson Transformers (including Aux. TX)
    - 33kV CRT Metering Switchroom
  • All HV, LV, and Communication Installation, Testing, and Termination
  • Ground Grid – Earthing Installation
  • Installation and Termination of the Electrical Metering, Communication, and SCADA systems,
    including all hardware to meet the DNO Network Communication Requirements
  • Pre-commissioning, Testing and Commissioning of the Transformers, 33kV Switchroom and
    associated 6 Panel Switchboard, 14 x 33/0.48/0.48kV Transformers, 4 x FNE and all associated
    Protection and Interfaces
  • Electrical Testing and Commissioning / G99 Grid Compliance Testing (DNO)
  • Site Lighting, Fire Detection, and Security Systems
  • Electrical Handover Documentation / Closeout Submittals / O&M Manuals
OVERVIEW

Harmony Energy is at the forefront of a greener and more sustainable future. Harmony Energy selected Tesla Energy Projects as their main contractor, who in turn procured the services of IUS for the electrical installation works. The Little Raith Battery Energy Storage System can store enough energy to power c. 450,000 homes for two hours in the aggregate.

DESCRIPTION

Turnkey design and build installation of a 50MW/100MWh Battery Energy Storage System (BESS) at Little Raith Farm near Cardenden, close to Lochgelly in Fife, Scotland. The complete installation was constructed in a 1 x 50MW phase with IUS the Principal Contractor under CDM for the whole scheme. All main items of the plant inclusive of the
containerised MV Switch room, Transformers, and the Tesla Megapack MP2XL Battery Units were supplied free issue by Tesla to the site, offloaded, and installed by IUS. IUS completed all equipment electrical works and contestable elements of the supply connection to the local DNO (SPEN - Scottish Power Energy Networks) distribution network.

DOWNLOAD PDF VERSION

Case Studies

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS are Carbon Neutral
IUS sponsor Wates Group Charity Dinner
IUS sponsor Wates Group Annual Charity Dinner 2024 in aid of Suicide Prevention
Bee Sustainable UK Initiative