Scottish Water - Ardersier WwTW - HV-LV Supply

Scottish Water - Ardersier

IUS was appointed by Scottish Water (SW) to provide a new HV supply to support the planned extension to the existing wastewater treatment works at Ardersier ...

Client

Scottish Water

Project

New wastewater treatment works (WwTW) - HV/LV supply

Location

Ardersier, Ross-shire

SERVICES PROVIDED
  • Design
  • Principal contractor duties
  • All civil works
  • Cable pulling and jointing
  • Traffic management
  • Engagement with the DNO and other parties
OVERVIEW

IUS was appointed by Scottish Water (SW) to provide a new HV supply to support the planned extension to the existing wastewater treatment works at Ardersier. Located on the outskirts of a conservation area, all works, including site traffic had to be carefully programmed and managed to minimize the impact to the area.

DESCRIPTION

Following significant reinforcement of the local 11kV network by SSEN, a suitable point of connection was identified for IUS to utilise.

IUS designed, supplied and installed the 3 core 150mm 11kV polymeric (LLDPE) cable circuit, from the overhead line point of connection, terminating at the HV switchgear controlling the 11,000/433V, 500kVA ground mounted transformer. The substation apparatus was located within a new purpose-built GRP housing. A LV supply was provided from the switchgear to the SW kiosk within the site. All apparatus was tested by IUS prior to energisation.

IUS fulfilled the role as Principal Contractor for the works and undertook all cable joints and terminations. Active engagement was maintained with all third parties, including SSEN to ensure that the works were completed to their requirements and to client timescales.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.