Northern Powergrid Load Logger Installation & Commission

Case Study

The VisNet Hub is designed to provide visibility of voltage and current for LV distribution substations. The Hub monitors the outgoing ways of an LV board providing insight about load, faults, and electrical condition across the network. It can measure three phases, plus the neutral for up to six Low Voltage circuits, busbar voltage, and battery status.

Client

Northern Powergrid

Project

Load Logger Installation & Commission

Location

Trinity Central – NPg Substation

Load Monitoring Case study
Load Monitoring Case study
SERVICES PROVIDED
  • Load Logger Planning
  • EA Unit Site Installation
  • EA Unit Low Voltage commission
  • EA Unit Service Provider verification
  • Northern Powergrid, I Host registering
OVERVIEW

The VisNet Hub is designed to provide visibility of voltage and current for LV distribution substations. The Hub monitors the outgoing ways of an LV board providing insight about load, faults, and electrical condition across the network. It can measure three phases, plus the neutral for up to six Low Voltage circuits, busbar voltage, and battery status.

The Vis-Net Hub utilises EA Technology’s Low Voltage Common Application Platform operating system, which allows a range of algorithms or Apps to be deployed at the distribution substation to expand the functionality of the unit beyond simple measurement. It can provide information about the state of the electrical network for operators to improve network performance.

DESCRIPTION

Trinity Central substation was comprised of 4 x Merlin Gerin RN2C UDE’s with 17 x LV Network feeder circuits to be monitored. IUS installed and commissioned 5 x EA Load Loggers via unit mag mounts and 4mm binder connections to establish the unit voltage connection. IUS installed 54 x Rogowski coils monitoring 17 x 3 phase feeder circuits, applied 4 x Transformer temperature sensors and commissioned 5 x units on the Service Provider and Northern Powergrid systems to prove a communications path, check transformer temperature, voltage measurements and overall device status.

“In delivering the LV Load monitor installation programme IUS have conducted themselves in their usual professional and competent manner.  From the initial concept phase through to the full-scale delivery programme they have proved themselves to be flexible and able to quickly accommodate changing priorities to meet their customer’s needs”

Gary Bartholomew - Major Projects, Northern Powergrid

Northern Powergrid
DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

blackburn meadows high voltage connections
Case Study: Blackburn Meadows WwTW upgrade for Yorkshire Water
This case study showcases Blackburn Meadows WwTW upgrade, and we are proud that Integrated Utility Services played a key role in helping deliver this major step forward for Yorkshire Water.
IUS Colleagues volunteer at Teesside Foodbank
Colleagues Volunteer at Teesside Foodbank
On 27th November, two of our colleagues, Kayleigh Forster and Daisy Ezard, volunteered at Tesco Billingham giving back to the community, supporting the Billingham & Stockton Borough Foodbank with the Trussell Trust. 
Road Safety Week 2025 at IUS
IUS Supports Road Safety Week 2025
Integrated Utility Services is proud to support our group-wide commitment to Road Safety Week, reminding everyone that safe vehicles save lives.