Melton Wind Farm 33kV Contestable Connection & Private Infrastructure Works

Melton Windfarm

IUS have completed the electrical construction works associated with the Melton Wind Farm ...

Client

Melton Wind Ltd / Seneca Global Energy

Project

Melton Wind Farm

Location

Gibson Lane, Melton, Hull, East Yorkshire

SERVICES PROVIDED
  • Outline and detailed design(Electrical and civil)
  • 33kV Contestable connection work
  • On site private 33kV infrastructure work
  • Procurement of equipment
  • Construction of primary substation building to DNO standards
  • HDD railway crossing
  • Possession planning
  • Installation of 33kV switchgear
  • Installation of containerised substations on raised platforms
OVERVIEW

IUS have completed the electrical construction works associated with the Melton Wind Farm development. The connection of the two 2.3MW Wind Turbines to the grid required a 33kV extension to the Northern Powergrid (NPg) electrical network. IUS were appointed to undertake the design and installation of the 33kV contestable elements of the connection works, along with the private 33kV and LV infrastructure.

DESCRIPTION

The project involved the construction of a combined building to house the 33kV NPg intake substation equipment and the customer owned 33kV switchgear.

The 33kV cable route to the new substation required the crossing of the Hull–London Railway Line by Horizontal Directional Drilling (HDD) methods. The IUS scope of works included all negotiations with Network Rail, HDD design and settlement calculations, possession planning and drilling operations.

The private electrical infrastructure installed by IUS included; 33kV, pilot and LV single core cables; a three panel 33kV switchboard; protection equipment; substation ancillary apparatus and two 2.5MVA containerised substations on raised platforms (flood risk mitigation).

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS Storm Darragh
Major Incident Response: Storm Darragh
As Storm Darragh swept across the region at the weekend with winds of up to 75mph, the IUS Overhead Line (OHL) Team was on the frontlines, stepping up to support Northern Powergrid in their response. 
Major Incident Response: Storm Bert
Integrated Utility Services Overhead Lines Teams supported Northern Powergrid with the response and restoration of overhead lines which were down due to Storm Bert this weekend.
Yorkshire Water Developer Day at University of Bradford Stadium