Lochend Windfarm 33kV Substation

Lochend Windfarm

IUS completed the installation of two 33kV cable circuits, which form part of the Lochend windfarm connection ...

Client

Lochend Windfarm

Project

33kV Substation Installation

Location

Caithness, Scotland

SERVICES PROVIDED
  • 33kV Contestable connection work
  • On-site private 33kV infrastructure work
  • Procurement of equipment
  • Supply and installation of substation GRP to DNO standards
  • Installation of 33kV switchgear
  • Heavy lifting operations
  • Protection design
  • Interfacing with DNO network and generation control systems
  • Testing and commissioning
  • Preparation of hand back documentation
  • Principal contractor for the connection works
OVERVIEW

IUS completed the electrical construction works associated with the Lochend Wind Farm development. The connection of four 2.3MW Wind Turbines to the grid required a 33kV extension to the Scottish and Southern Energy electrical network. IUS was appointed to undertake the design and installation of the 33kV contestable elements of the connection activity.

DESCRIPTION

The project involved the supply and installation of a specialised multi-part GRP enclosure, which reduced construction costs and on-site installation times. Within the GRP housing, 33kV Schneider Electric WS switchgear was installed with connections made to the extra high voltage cable circuits using Pfisterer terminations. The design, installation, and commissioning of all associated DC and control systems also formed part of the IUS work scope.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS Storm Darragh
Major Incident Response: Storm Darragh
As Storm Darragh swept across the region at the weekend with winds of up to 75mph, the IUS Overhead Line (OHL) Team was on the frontlines, stepping up to support Northern Powergrid in their response. 
Major Incident Response: Storm Bert
Integrated Utility Services Overhead Lines Teams supported Northern Powergrid with the response and restoration of overhead lines which were down due to Storm Bert this weekend.
Yorkshire Water Developer Day at University of Bradford Stadium