HV Contestable Connection - Maynes Coaches, Scotland

Maynes Coaches EV Install - Scotland

As part of an ongoing requirement for the use of renewable energy, Maynes Coaches has been expanding its fleet of vehicles with new EV buses. To support this objective, new battery charging facilities were needed at their main depot at Buckie.

Integrated Utility Services (IUS) were appointed to carry out the High Voltage (HV) connection works, including the supply and installation of the electrical apparatus within the substation.

Client

Zenobē

Project

HV Contestable Connection - Maynes Coaches

Location

Buckie, Scotland

Zenobe Transformer - Scotland
Zenobe Transformer - Scotland
SERVICES PROVIDED
  • Engagement with selected IDNO to enable IUS to produce an approved design
  • Supply and installation of an 11kV/433V 1MVA transformer and LV Air Circuit Breaker unit
  • Supply and installation of an 11kV underground cable circuit from the Point of Connection to the intake substation, including interconnecting LV cables
OVERVIEW

As part of an ongoing requirement for the use of renewable energy, Maynes Coaches has been expanding its fleet of vehicles with new EV buses. To support this objective, new battery charging facilities were needed at their main depot at Buckie.

Integrated Utility Services (IUS) were appointed to carry out the High Voltage (HV) connection works, including the supply and installation of the electrical apparatus within the substation.

DESCRIPTION

IUS is a framework service provider for Zenobe Energy. The framework agreement encompasses the design, supply and installation of the contestable element for new connections. This project involved a new HV connection to support ‘5No’ dual electric vehicle charging units for the new fleet of EV buses for Maynes Coaches at Buckie, Morayshire. IUS engaged directly with the Distribution Network Operator (DNO) and the Independent (DNO) to complete the design requirements and approvals.

 

Prior to agreeing the cable route and installation of new equipment, active engagement was necessary with all relevant stakeholders. This included the DNO, IDNO, and Maynes Coaches. This allowed IUS to plan the optimum work sequence for the ground works, cable installation, jointing, and connection requirements, whilst maintaining full operational access for vehicle movement for Maynes Coaches.

 

Following design acceptance, IUS procured all materials, including the new 11kV/433V 1MVA transformer, HV Ring Main Unit (RMU), and cabling, all in compliance with the DNO and IDNO specifications and adoptable standards.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.