Draper Yard - ASE II Temple Properties, Leeds

IUS were contracted to construct a new 1000kVA, 11000/433V UDE substation comprising a transformer with close coupled 11kV ring main unit and 1600amp ACB to provide ...

Wren Kitchens

The scope of works was to design, supply and install a 15MVA, 11kV network including substations and interconnecting cables to provide the power for a new Wren Kitchens ...

Unilever, Leeds Supply Upgrade 11kV Contestable Connection & Private Infrastructure Works

IUS completed the electrical construction works associated with Unilever’s supply upgrade at ...

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV)
Full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV)
We are proud to announce that we have successfully achieved an LRQA NERS scope extension, securing full NERS accreditation for Network Connections Operational & Jointing (11kV & 20kV). This milestone reflects the strength, capability, and professionalism of our teams delivering high‑quality connection works across the UK.
IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.