EnergieKontor Operation & Maintenance of Customer Owned HV & EHV Networks

EnergieKontor

IUS has c.1100 operation and maintenance agreements throughout the UK. There are three locations ...

Client

EnergieKontor

Project

Operation and maintenance of power systems at three UK windfarm sites

Location

Burton Pidsea, East Yorkshire Withernwick, East Yorkshire Lilbourne, Northamptonshire

SERVICES PROVIDED
  • Operation and maintenance of customer HV and EHV networks
  • Liaison with site operators
  • Liaison with local Distribution Network Operators
  • Site inspection
  • Planned maintenance
  • Reactive response to site
  • Fault identification and repair
OVERVIEW

IUS has c.1100 operation and maintenance agreements throughout the UK. There are three locations where IUS carry out this activity for EnergieKontor on their UK windfarms. This service includes inspection and switchgear maintenance. IUS also provides a call out service for emergency response.

DESCRIPTION

IUS is contracted to provide planned and reactive operation and maintenance services at three UK windfarms operated by EnergieKontour.

The contracted sites are:

  • Burton Pidsea Windfarm in East Yorkshire, which comprises of three turbines with a capacity of 10.2 MW.
  • Withernwick Windfarm in East Yorkshire, which comprises of nine turbines with a capacity 18.45 MW.
  • Lilbourne Windfarm in Northamptonshire, which comprises of five turbines with a capacity of 10 MW.

Site operations and activities are coordinated with the EnergieKontour control facility in Germany.

IUS services on these and similar contracts comprise of network operation, site inspection, planned maintenance and fault management and repair.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS proud to support Yorkshire Water on a milestone project
IUS proud to support Yorkshire Water on a milestone project
Integrated Utility Services (IUS) has successfully completed the High Voltage (HV) replacement works at Yorkshire Water's Langsett Raw Water Pumping Station (RPS) and Marsh Water Pumping Station (WPS) sites, installing Schneider Electric’s new SF₆‑free AirSeT 11kV switchgear in place of the ageing Igranic units.
Substation Installation at Northern Gas Networks’ NeRV site
Substation Installation at Northern Gas Networks’ NeRV site
Last week, our team at Integrated Utility Services were on site at Northern Gas Networks’ NeRV (Net Zero Research Village), working on the final 11kV cable jointing and terminations, testing and commissioning ahead of the site being energised.
IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.