ECARS New Installation and Replacement Programme

ECARS EV Charing Points in Ireland

ESB engaged Integrated Utility Services (IUS) to install new units to replace a number of their existing Ecar charging points. The work was undertaken at various locations throughout Ireland. IUS was selected for our civil capability, as well as familiarity with the installation of ducting for ESB networks. IUS complied with all ESB standards and procedures, resulting in a growing network of public charging points.

Client

ESB Networks

Project

ECARS New Installation and Replacement Programme

Location

Across Ireland

ECARS EV Charing Points in Ireland
ECARS EV Charing Points in Ireland
SERVICES PROVIDED
  • Charger and interface installation
  • Ducting and Cabling
  • Civil Engineering
  • Signage, Bollard and Plinth installation
  • Roadmaking’s
  • Drainage works
  • Full reinstatement of works including concrete and macadam areas
  • Traffic management
  • Project management
  • PSCS Health & Safety management
  • Customer and public interface
OVERVIEW

ESB engaged Integrated Utility Services (IUS) to install new units to replace a number of their existing Ecar charging points. The work was undertaken at various locations throughout Ireland. IUS was selected for our civil capability, as well as familiarity with the installation of ducting for ESB networks. IUS complied with all ESB standards and procedures, resulting in a growing network of public charging points.

DESCRIPTION

The project involved installing new and replacing existing Ecar charger points in over 100 locations throughout Ireland.


The work sites included built up areas, shopping centre carparks and remote rural locations. IUS managed the projects, complying with Health and Safety Regulations, traffic management procedures and local council requirements. All works were completed to ESB Specifications and Standards.


The scope of services included siting the new Ecar units on plinths cast in concrete, excavation of cable ducts, cabling between the Ecar charger points, installation of interface unit and the ESB mini pillar, signage, road markings, full reinstatement, and completion of test certification prior to sign off by our client, ESB.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS Industrial Stand Down Q1
IUS Industrial Stand Down Focuses on Commitment to Safety in 2026
On Friday, we brought our Industrial teams together at Ripon Racecourse for our Integrated Utility Services Industrial Stand Down, taking time to step back, reflect and align on our priorities for the quarter ahead.
Fibre Build Careers Fair
IUS Attend Fibre Build Careers Fair
As part of our ongoing recruitment drive, Integrated Utility Services team members attended BT’s Fibre Build Careers Fair in Leeds last week...
new careers portal
Launching our brand new recruitment portal
As we head into the New Year, we are launching our brand new recruitment portal. With our business continuing to grow and deliver key framework contracts across the UK, we’re looking for skilled, driven people to join us on the journey.