IUS were contracted by Hull University Teaching Hospitals NHS Trust to install the 11kV Infrastructure for a new 5MWe Solar Farm on land adjacent to Castle Hill Hospital ...

Client

Hull University Teaching Hospitals NHS Trust

Project

11kV Infrastructure for a 5MWe Solar Farm

Location

Castle Road, Cottingham, Hull

SERVICES PROVIDED
  • HV network design
  • P28 / G99 reports
  • G99 protection design
  • Earth design and report
  • Civils construction designs
  • Ground survey reports
  • Installation of 11kV infrastructure (cable installation and civils, transformers, and switchgear)
  • Test and commissioning
OVERVIEW

IUS were contracted by Hull University Teaching Hospitals NHS Trust to install the 11kV Infrastructure for a new 5MWe Solar Farm on land adjacent to Castle Hill Hospital, as part of the trusts plans to become carbon neutral by 2030.

DESCRIPTION

IUS provided expert support for the scheme, by designing the HV network, P28/G99 studies and reports, G99 protection study, earthing report, ground surveys & borehole analysis, heat gain calculations, construction designs and all other relevant design requirements. IUS constructed two substations inclusive of HV compounds, LV plant rooms and inverter rooms. The cable/duct installation carried out by IUS, involved excavation by conventional open cut trench, as well as horizontal directional drilling method.

IUS supplied and installed:
1x 2MVA transformer, 1x 3MVA transformer, 2x 11kV ring main units, 2x battery tripping units and relay panels. The IUS scope of service included an in depth and technical G99 protection scheme, installed in compliance with the local Distribution Network Operator, Northern Powergrid specification.

IUS provided a dedicated project team to ensure the day-to-day running of the project was carried out safely, efficiently and to a high quality standard, to the client’s satisfaction. IUS also provided our ‘in-house’ senior authorised person and technical service support throughout the project to ensure safe systems of work were implemented and maintained and equipment/protection was pre-commissioned to the highest of standards.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Gigafactory in Sunderland
Project Spotlight: AESC UK gigafactory battery factory in Sunderland
Integrated Utility Services (IUS) is proud to partner with Wates Group on the AESC UK gigafactory battery factory in Sunderland! 
Persimmon Homes Multi Utility Install: Laneside Farm Phase 1
Persimmon Homes engaged IUS to deliver Multi Utility installations for a 450-plot housing development in Morley, Leeds, including gas, water, and electrical connections, as well as the construction of two HV substations.
Major Incident Response: Storm Eowyn
Outstanding Team Effort by Integrated Utility Services (IUS) Overhead Line teams and contractors, who worked in partnership with Northern Powergrid’s teams to tackle damage caused by Storm Eowyn - the sixth storm in just three months.