Northern Powergrid Automation Commission - Spring Bank

NPg Automation Commission

IUS has been involved in supporting NPg automation for many years in a bid to help sustain and improve the infrastructure and network control remote ...

Client

Northern Powergrid

Project

Automation

Location

Spring Bank Road 644, Farsley, Leeds

SERVICES PROVIDED
  • Test/Commission of RTU & Actuators.
OVERVIEW

IUS has been involved in supporting NPg automation for many years in a bid to help sustain and improve the infrastructure and network control remote switching capability which lessons power outages for customers should a fault or trip occur. As such IUS provides installation, commissioning, and technical support to NPg, which improves network restoration time and remote switching capability for 11kV ground Mounted switchgear.

DESCRIPTION

The work involves carrying out a detailed survey of a substation to ascertain if the site is suitable for automation. The survey considers the switchgear installed, network design required by NPg and signal strength tests for connectivity to a secure communication network. The survey would identify the automation equipment to be installed by approved remote terminal unit (RTU) installers, and later actuators to be commissioned by an IUS senior authorised person (SAP).

Site installation of the RTU was carried out following a successful site survey to identify where the unit would be wall-mounted and umbilical cables run between RTU and the switchgear already pre-installed. The design incorporates fault path indicators to be automated and wired into the RTU that indicate back to control if a fault occurs.

Commissioning of the site was carried out by an authorised SAP. Final connections were made onsite and local operational tests were carried out. Once satisfied that the installation was operationally ready the SAP would contact the control desk engineer and carry out any network reconfigurations required under a system outage to allow remote operation. Remote testing is accomplished by the control desk engineer and the Automation equipment made operational on the NPg network.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

Vattenfall IDNO and Integrated Utility Services Project
Integrated Utility Services partners with Vattenfall IDNO for third project
Integrated Utility Services Limited are proud to announce that we have been appointed by Vattenfall IDNO to build a High Voltage network, which will be the third contract we’ve signed with them!
NERS Partial Scope Extension
NERS Partial Scope Extension
We have extended our NERS accredited scopes to include the following partial scopes: Network Connections – Jointing (11kV, 20kV) and Network Connections – Operational (LV,11kV, 20kV)
New Year, New Job Opportunities at IUS
We have a range of exciting job vacancies opening in the New Year. This is your chance to join a dynamic, forward-thinking team dedicated to building a brighter, more sustainable future.