Lovell Homes - Howden - Goole

Lovell Homes

The scope of works included the design, procurement and installation of UDE (Unit Distribution Equipment) substation ...

Client

Lovell Homes

Project

Substation for 174 New Homes Development

Location

Selby Road - Howden - Goole

SERVICES PROVIDED
  • HV and LV network design
  • Installation of 11kV substation to include HV switchgear, 800kVA transformer and 5 way LV fuse board to supply 174 new homes
  • Construction to the adoptable standards of Northern Powergrid (Npg) and ESP Utilities Group (ESPUG)
OVERVIEW

The scope of works included the design, procurement and installation of UDE (Unit Distribution Equipment) substation consisting of Schneider Electric RN2-C HV switchgear, 800kVA transformer, complete with a close coupled 5-way LV board. The UDE, once energised, provided power to 174 new homes on the Saddlers Grange development in Howden. This substation is dual owned by Northern Powergrid (NPg) and ESP Utilities Group (ESPUG), therefore constructed to the adoptable standards of both parties.

DESCRIPTION

IUS installed approximately 300m of 3 x 1 core 300mm aluminium XLPE cable from the substation location to the agreed point of connection, together with an 80m length of 70mm bare copper earth, which forms part of the HV earthing arrangement. IUS then carried out excavation works around the substation building to install this earthing system. The programme was critical as the housing developer had prospective homeowners eagerly waiting the handover of their new properties. IUS successfully met the expectations of Lovell Homes and their customers by executing our works within the allotted timeframes.

The IUS protection engineer carried out the pre-commissioning tests including primary and secondary injection testing. Once the UDE had been successfully tested our HV authorised cable jointers attended site to carry out the HV cabletermination and LV terminations at the 5-way LV board.

As well as IUS cable jointers and the protection engineer, other trained, authorised and competent members of the site delivery team included our electrical fitters and the Senior Authorised Person responsible for safety documentation. The key points of contact for Lovell Homes was the IUS project manager and project coordinator, who have the responsibility, as per there titles, for the management and coordination of all the works. The IUS team all contributed to the safe and successful energisation of an essential substation asset.

DOWNLOAD PDF VERSION

Careers in IUS

Read More

/sites/default/files/2023-09/careers_2_0.jpg

IUS News

IUS Storm Darragh
Major Incident Response: Storm Darragh
As Storm Darragh swept across the region at the weekend with winds of up to 75mph, the IUS Overhead Line (OHL) Team was on the frontlines, stepping up to support Northern Powergrid in their response. 
Major Incident Response: Storm Bert
Integrated Utility Services Overhead Lines Teams supported Northern Powergrid with the response and restoration of overhead lines which were down due to Storm Bert this weekend.
Yorkshire Water Developer Day at University of Bradford Stadium