In Scotland IUS has delivered a Battery Energy Storage System (BESS), which impressed Michał Kuciński of Tesla. "I want to acknowledge the outstanding work that the IUS team has been consistently delivering at the Little Raith site over the past few months. Certainly, from my side, it feels like Tesla and IUS developed a partnership with a common goal of completing our BESS project on time, in the best possible quality. The team that I’m working with on day-to-day basis is of utmost help, impresses with professionalism, puts attention to small but important details and represents a united front with Tesla. I would like to express my sincere gratitude to the entire IUS team involved.”
IUS are an experienced delivery partner in power distribution and have worked extensively for licence holders in the regulatory sector.
IUS are trained, authorised and competent to deliver works for both DNO’s and Independent DNO’s.
We can adhere to their specifications and design, supply and install electrical infrastructure to the required standards. This can be via working directly for the DNO/IDNO, generally via a framework agreement or as an Independent Connections Provider, with the network being adopted on energisation.
IUS operate throughout the UK on Low Voltage networks through to 132kV.